_Client:
___HBG
_Value:___
£2.7 Million
_Duration:_
2006
|
- Contract
was a design and construct contract with HBG as main contractor.
-
Walters UK Limited undertook the works on a fixed price basis
incorporating earthworks, programme risk.
-
Works completed to tight fast track deadlines.
-
Earthworks included
-
Clearance of 4 hectare site
-
Cut/fill earthworks 70000 m3
- 15000m3
disposal of surplus u/s
- Construction
of 3 crib lock walls up to 12m high - 2200m2
-
Infrastructure included
-
Building foundations
- 3800m2
block and slab paving
- 10000m2
bituminous car park
- 6000m2
PQ concrete service yards
- Associated
storm and foul drainage network including 3 containment tanks
- Gabion
and blockstone cascade works
- Ecological
and environmental constraints adjacent to the Sirhowy River.
|
|
|