_Client:
___Blaenau Gwent CBC
_Value:___
£3.5 Million
_Duration:_
2006
|
- The
21 hectare site is located within the former steelworks at Ebbw
Vale
and has a history of over 200 years of industrial usage including
ironstone and coal mining, iron and steel production, coke ovens,
tinplating and railway idings and locomotive maintenance.
- The
regeneration strategy includes:
- Large
scale earthworks to create a generally uniform platform and the
formation of a 1.5m to 2m thick constraint free zone below the
finished surface.
-
The breaking out and removal of approximately 50,000m3 of reinforced
concrete slabs and foundations.
-
Improvement of the bearing and settlement characteristics of the
soils.
-
Improvement of the land form.
-
The stabilisation and capping of all recorded mine entries and
the back filling of existing basements and other voids.
-
The bioremediation of 12,500m3 of hydrocarbon contaminated soils.
-
Extensive chemical testing and analysis.
-
The diversion and raising of existing deep surface water culverts
and foul sewers.
|
|
|