_Client: ___LG Electronics / Engineering
_Value:___ £14.6 Million
_Duration:_ 1997 - 1998

_ _Walters UK Ltd
  • The enabling works for the LG Complex began in January 1997.

  • Walters undertook works on both the LG Electronics Site and the LG Semicon Site between January 1997 and July 1998.

  • In this time it carried out several work packages of varying complexity calling for a wide variety of skills and expertise.

    LG Electronics LG Semiconductor Plant

    Earthworks Enabling
    Design and Installation of Piling and Monitor Building
    Site Infrastructure and Road
    Works R C Waste Water Tank
    R C Water Supply Tank
    VIP Car Parks

    TOTAL
    £1.7m £0.2m

    £4.3m £0.3m £0.9m £0.2m

    £7.6m
    Site Preparation
    Site Infrastructure and Roadworks
    Waste Water Treatment Plant
    Off Site Waste
    Water Treatment System


    £0.7m
    £5.7m

    £0.4m

    £0.2m


    £7.0m

  • Over 600,000m³ of excavation and filling.

  • Over 20 kilometres of drains from 150 to 1350mm diameter at depths of up to 8m.

  • 14,000m² of road construction with 17,000m of kerbs and 500m of drainage channels.

    More than 6,000m³ of reinforced concrete.