_Client:
___Bellway Homes
_Value:___
£2.2 Million
_Duration:_
2002 - 2003
|
- The
contract was to reclaim from the estuary and prepare for residential
development 4.5 hectares extending into the impounded water of
Cardiff Bay.
-
The completion of a partially constructed stone bund reinforced
with geogrids, some 450m long.
-
The importation of 230,000m3 of common fill recycled hardcore
and quarried stone to raise the level of the reclaimed land above
the potential flood level.
- The
installation of some 12,000 band drains to help the consolidation
of the underlying alluvium.
-
Extensive monitoring of the ground and bund levels.
-
The whole of the Scheme was carried out in environmentally sensitive
conditions.
-
The client is developing the site for 650 houses and apartments.
|
|
|